Full turnkey bathroom renovations across Blackheath, Greenwich, and Charlton. Plumbing, high-end tiling, and electrics coordinated by a single family firm. Two to three weeks from teardown to final decoration.
Most bathroom renovations we undertake in Blackheath, Greenwich, and Charlton run between two and three weeks from the day of teardown through to final decoration. The timeline depends on the complexity of the layout change, whether soil pipe positions are moving, and the extent of tiling involved.
Our initial site visit covers dimensional measuring, spatial layout assessment, and a plumbing feasibility review. For high-flow shower installations — thermostatic power showers and rain-head units — we check mains pressure and flow rate against the manufacturer's minimum requirements before specifying anything. Fitting a high-spec shower head to an undersized supply is one of the more common sources of homeowner frustration after a renovation, and we address it at the survey stage.
The practical advantage of using R G Austin Ltd for a bathroom renovation is that the plumbing, tiling, and electrical work are all managed under one roof and directly scheduled by the same team. When those trades are sourced separately, delays compound. A tiler arrives before the plumber has confirmed the waste positions. An electrician quotes for work that has already changed based on a revised layout. Those coordination failures are what push bathroom renovations over budget and over time.
No planning permission is required in the vast majority of cases. The exception is where structural modifications involve moving a soil stack on an external wall of a property with listed building status — relevant to some of the older Georgian and Edwardian properties in Blackheath and Greenwich conservation areas.
You describe what you want to change — full renovation, wetroom conversion, or targeted upgrade. We discuss property type, existing plumbing layout, and approximate budget range to establish whether a site visit is the right next step.
A director attends to measure the space, inspect existing plumbing and waste positions, assess the condition of the substrate behind existing tiles, and check water pressure against your preferred shower specification. A detailed fixed-price estimate follows within 48 hours.
The written estimate covers labour, waste disposal, and a breakdown of work stages. Once you confirm, we schedule the start date. All trades — plumbing, tiling, electrical — are booked and sequenced before work begins.
The existing bathroom is stripped to bare walls and floor. First fix plumbing runs are repositioned as specified. First fix electrical work — extractor fan, heated towel rail, shaver socket — is completed before waterproofing and tiling begin.
Waterproofing is applied to all wet areas. Tiling follows the agreed layout. Second fix plumbing and electrical complete the installation. The space is cleaned down, snagged, and signed off with you before we leave the site.
Every project starts with a fixed-price proposal. No provisional sums, no variations without your written sign-off. The survey is designed to surface all foreseeable complications before the estimate is issued.
Jack really helped me out with replacing a shower arm that had broken off in the wall. He repaired damage left by a previous plumber who had tried and failed. The work was completed quickly to a high standard. Friendly from start to finish, and clearly proud of the good work they do.
We visit, measure, and provide a written fixed-price estimate for your bathroom renovation.
We'll confirm receipt and arrange a site assessment.