Bathroom Renovations · Blackheath & South East London

Bathroom & Shower Room
Renovations in
South East London

Full turnkey bathroom renovations across Blackheath, Greenwich, and Charlton. Plumbing, high-end tiling, and electrics coordinated by a single family firm. Two to three weeks from teardown to final decoration.

Gas Safe RegisteredOver 60 Years TradingThird-Generation Family BusinessFully Insured

Full Bathroom Renovations Managed
by One Family Firm

Most bathroom renovations we undertake in Blackheath, Greenwich, and Charlton run between two and three weeks from the day of teardown through to final decoration. The timeline depends on the complexity of the layout change, whether soil pipe positions are moving, and the extent of tiling involved.

Our initial site visit covers dimensional measuring, spatial layout assessment, and a plumbing feasibility review. For high-flow shower installations — thermostatic power showers and rain-head units — we check mains pressure and flow rate against the manufacturer's minimum requirements before specifying anything. Fitting a high-spec shower head to an undersized supply is one of the more common sources of homeowner frustration after a renovation, and we address it at the survey stage.

The practical advantage of using R G Austin Ltd for a bathroom renovation is that the plumbing, tiling, and electrical work are all managed under one roof and directly scheduled by the same team. When those trades are sourced separately, delays compound. A tiler arrives before the plumber has confirmed the waste positions. An electrician quotes for work that has already changed based on a revised layout. Those coordination failures are what push bathroom renovations over budget and over time.

No planning permission is required in the vast majority of cases. The exception is where structural modifications involve moving a soil stack on an external wall of a property with listed building status — relevant to some of the older Georgian and Edwardian properties in Blackheath and Greenwich conservation areas.

  • On-site dimensional measuring and layout planning at survey stage
  • Plumbing, tiling, and electrical trades coordinated by one firm
  • Flow rate and pressure testing for shower specifications
  • Suitable for Victorian, Edwardian and modern properties across SE London
  • Fixed price from written estimate through to final decoration
R G Austin Ltd engineers fitting a UFH manifold and Hansgrohe shower system during a bathroom renovation in London

From Initial Survey to
Final Decoration

Initial Call & Property Discussion

You describe what you want to change — full renovation, wetroom conversion, or targeted upgrade. We discuss property type, existing plumbing layout, and approximate budget range to establish whether a site visit is the right next step.

Site Survey & Feasibility Assessment

A director attends to measure the space, inspect existing plumbing and waste positions, assess the condition of the substrate behind existing tiles, and check water pressure against your preferred shower specification. A detailed fixed-price estimate follows within 48 hours.

Fixed-Price Proposal & Scheduling

The written estimate covers labour, waste disposal, and a breakdown of work stages. Once you confirm, we schedule the start date. All trades — plumbing, tiling, electrical — are booked and sequenced before work begins.

Strip-Out, First Fix Plumbing & Electrics

The existing bathroom is stripped to bare walls and floor. First fix plumbing runs are repositioned as specified. First fix electrical work — extractor fan, heated towel rail, shaver socket — is completed before waterproofing and tiling begin.

Tiling, Second Fix & Decoration

Waterproofing is applied to all wet areas. Tiling follows the agreed layout. Second fix plumbing and electrical complete the installation. The space is cleaned down, snagged, and signed off with you before we leave the site.

What Is & Isn't Included in a Standard
Bathroom Renovation Contract

Typically Included

  • Full strip-out and responsible disposal of all existing fixtures
  • First and second fix plumbing for bath, shower, basin, and WC
  • Mains pressure test and flow rate check at survey stage
  • Waterproofing to all wet areas prior to tiling
  • Tiling of walls and floor to agreed specification
  • Extractor fan, heated towel rail, and standard lighting connection
  • Full clean-down and site clearance on completion

What May Fall Outside Standard Scope

  • Structural modifications — moving a soil stack on an external wall — identified at survey and quoted separately if relevant
  • Supply of sanitaryware and tiles — we install client-supplied or source on your behalf at cost
  • Mains pressure booster pump where supply is insufficient for a specified shower system
  • Listed building consent where required for external wall modifications in conservation areas
  • Plastering and general redecoration beyond the bathroom — quoted separately if the scope extends

Every project starts with a fixed-price proposal. No provisional sums, no variations without your written sign-off. The survey is designed to surface all foreseeable complications before the estimate is issued.

Jack really helped me out with replacing a shower arm that had broken off in the wall. He repaired damage left by a previous plumber who had tried and failed. The work was completed quickly to a high standard. Friendly from start to finish, and clearly proud of the good work they do.

David L.Bathroom Shower RefitGreenwich

Frequently Asked Questions — Bathroom Renovations in South East London

A full bathroom renovation in South East London typically takes two to three weeks from initial teardown through to final decoration. This includes plumbing, tiling, electrical work, and fitting. R G Austin Ltd manages all trades as a single coordinated project — you have one point of contact throughout.
A full bathroom renovation in Blackheath and SE London typically ranges from £5,000 to £20,000 depending on the scope, fixtures chosen, and whether structural plumbing changes are required. We provide detailed fixed-price proposals after an initial site survey — the quoted price is the price you pay on completion.
Yes. R G Austin Ltd manages plumbing, tiling, and electrical work as a single coordinated project. You deal with one family business rather than scheduling and managing multiple separate trades. All electrical work is Part P certified and all plumbing is Gas Safe where applicable.
Victorian and Edwardian properties are our most common project type across Blackheath, Greenwich, and Charlton. We have extensive experience working around the specific challenges of period properties — including repointing, managing original cast iron pipework, and installing modern high-flow showers in properties with lower mains pressure.
Planning permission is not required for most bathroom renovations. Exceptions apply only where structural modifications involve moving soil pipes on exterior walls of listed properties. Our initial survey identifies any planning considerations before work begins.
Yes. We install fully tanked wet rooms throughout South East London. Our team assesses floor structure, fall gradient, and drainage capacity during the initial site visit to confirm feasibility before any work is quoted.
24/7 Emergency Callouts · Blackheath SE3

Arrange a straightforward,
no-obligation home site assessment.

We visit, measure, and provide a written fixed-price estimate for your bathroom renovation.

Book a Free Quote Call Our Team · 07738 124344
info@rgaustin.co.uk · 2a Hassendean Road, Blackheath SE3 8TS

Enquire About Bathroom Renovations
in South East London

Book a Free Quote

We'll confirm receipt and arrange a site assessment.

🔒 3rd-Generation Family Protection Accountability · Zero Obligation Home Assessment
Office Hours
Monday – Friday
09:00 – 17:00 · Closed Weekends
Address
2a Hassendean Road
London, SE3 8TS